The blockade on the Gabarre Bridge was lifted on Wednesday, November 18, ending a disruption that affected traffic in both directions. This gathering was organized in support of a member of the Nou Las Palé collective, who was taken into police custody. Although the blockade has ended, traffic will still take some time to normalize, causing inconvenience for drivers.
Gabarre Bridge: lifting of the blockades and gradual return to traffic
This article was updated at 14:25.