The repairs to the road in Spring Mount, severely damaged by Hurricane Melissa, are progressing slowly. Soil tests must be conducted before the reconstruction design can be finalized. Residents, concerned about the situation, are awaiting information on the timeline for the work. The head of the National Works Agency emphasized that the complexity of the project requires a careful approach, including specific tests to ensure the road's durability.