The Carraízo valve was opened due to a breach of the safety level. This phenomenon was observed after a significant increase of 23 centimeters. Authorities are closely monitoring the situation to prevent any risk of flooding in the surrounding areas. Preventive measures are being implemented to ensure the safety of residents.
Carraízo: valve opened after a critical level reached
This article was updated at 13:45.