The Ministry of Public Works announces the closure of the ramps of the Piedra Blanca bridge in two phases. The first phase will take place from October 12 to 16, heading from Santo Domingo towards Cibao. The second phase is scheduled from October 19 to 23, in the opposite direction. Motorists will need to follow the signs and pass under the bridge during these periods. Coordination measures are being implemented to ensure smooth traffic flow.
Temporary closure of the ramps of the Piedra Blanca bridge for maintenance
This article was updated at 15:30.